Just got through reading a document that confirms the theory that the armorers bolts that were used in production at Mauser came from a depot being evacuated in the east, in front of Russian advances. Document states the number of bolt bodies coming from Posen as 10,000, with an additional 10,000 from FN. This document is from Oct. 44. It even names the man in charge on the Posen side.
What is interesting is the last paragraph talks about the evacuation of equipment from FN (to manufacture bolts), and speaks of setting a schedule to get that equipment back into production making pars at a different location.
It's pretty clear (but without documents) that the HWA (HeeresWaffenamt) was doing this to keep production on schedule, and even ramp up production at Mauser in the last desperate months, along with making use of evacuated 98k components.
What is interesting is the last paragraph talks about the evacuation of equipment from FN (to manufacture bolts), and speaks of setting a schedule to get that equipment back into production making pars at a different location.
It's pretty clear (but without documents) that the HWA (HeeresWaffenamt) was doing this to keep production on schedule, and even ramp up production at Mauser in the last desperate months, along with making use of evacuated 98k components.